FRONT RANGE OFFICE CAMPUS
LONGMONT, CO
CAPACITY GENERAL CONTRACTOR
COMPLETION AUGUST 2020
SIZE 223,000 SF
PROFILE GROUND UP, CLASS A OFFICE & INDUSTRIAL COMPLEX, PEMB CONSTRUCTION
MERRILL LYNCH
SOUTHAMPTON, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION AUGUST 2007
SIZE 5,000 SF
PROFILE GROUND UP, CORPORATE OFFICE & STOCK BROKERAGE
PRIME PLACE
HAUPPAUGE, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION JULY 2017
SIZE 200,000 SF
PROFILE GROUND UP, CLASS A OFFICE & INDUSTRIAL COMPLEX, PEMB CONSTRUCTION
QUALITY KING
BELLPORT, NY
CAPACITY CONSTRUCTION MANAGER
COMPLETION JANUARY 2008
SIZE 645,000 SF
PROFILE 3-STORY OFFICE STRUCTURE WITH A MANUFACTURING WAREHOUSE CONSTRUCTED WITH INSULATED TILT-UP CONCRETE PANELS
HYATT PLACE HOTEL
FORT LEE, NJ
CAPACITY CONSTRUCTION MANAGER
COMPLETION JULY 2020
SIZE 120,000 SF, 167 KEYS
PROFILE GROUND UP, 10-STORY, HEAVY GUAGE PANELIZED CONSTRUCTION WITH 166 ROOMS, A COMMERCIAL KITCHEN, DINING, BAR, FITNESS CENTER & MEETING FACILITIES
COUNTRY FAIR ENTERTAINMENT PARK
MEDFORD, NY
CAPACITY CONSTRUCTION MANAGER
COMPLETION FEBRUARY 2014
SIZE 28,000 SF
PROFILE GROUND UP, 2-STORY SUPERSTRUCTURE, PEMB & MASONRY CONSTRUCTION WITH MULTIPLE DINING AREAS, A COMMERCIAL KITCHEN, PARTY ROOMS, GAMING ARCADE, RETAIL SPACE, OFFICES & PERGOLA FOR OUTDOOR DINING
ROCK & ROLL HALL OF FAME
NEW YORK, NY
CAPACITY CONSTRUCTION MANAGER
COMPLETION JANUARY 2009
SIZE 28,000 SF
PROFILE INTERIOR BASEMENT RENOVATION FOR ROCK & ROLL HALL OF FAME ANNEX MUSEUM ON MERCER STREET IN NYC.
HAMPTON INN & SUITES
HUNTINGTON, NY
CAPACITY CONSTRUCTION MANAGER
COMPLETION APRIL 2022
SIZE 60,000 SF, 81 KEYS
PROFILE RENOVATION OF ORIGINAL TOWN HALL BUILDING FOR PUBLIC SPACES INCLUDING EXTERIOR RESTORATION/CONSERVATION, STRUTURAL REMEDIATION, MECHAINCAL, ELECTRICAL, PLUMBING, FIRE ALARM, AND FIRESRINKLER TO UPGRADE BUILDING TO COMPLY WITH CURRENT BUILDING CODE REQUIREMENTS. NEW (4) STORY ADDITION FOR GUEST ROOMS AND PARKING. STRUCTURAL STEEL, CONCRETE GRADE BEAMS, UNDERPINNING, PANELIZED WALL SYSTEM, FLOOR & ROOF TRUSSES, (2) NEW ELEVATORS, (2) EGRESS STAIRWELLS, (2) INTERIOR COURTYARDS, FITNESS CENTER, AND (81) GUEST ROOMS.
STONY BROOK SQUARE
STONY BROOK, NY
CAPACITY CONSTRUCTION MANAGER
COMPLETION MARCH 2020
SIZE 23,000 SF
PROFILE 4 SEPARATE GROUND UP RETAIL BUILDINGS WHICH CONSIST OF 17 TENANT SPACES. THE FACADE FEATURES SPLIT-FACE MASONRY, HARDIPLANK SIDING & AZEK TRIM.
KIMCO - BURLINGTON & FIVE BELOW
COMMACK, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION OCTOBER 2019
SIZE 62,600 SF
PROFILE CONVERTED AN EXISTING SALES SPACE INTO 3 NEW RENOVATED RETAIL SPACES AND FIT OUT BURLINGTON & FIVE BELOW, STRICTLY ADHERING TO BRAND STANDARDS
NOVAK MOTORS
FARMINGDALE, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION DECEMBER 2016
SIZE 130,000 SF
PROFILE CONVERTED A MANUFACTURING WAREHOUSE INTO AN AUTO SHOWROOM & SALES FLOOR
RESTAURANT DEPOT
BOHEMIA, NY & MASPETH, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION
BOHEMIA: JANUARY 2017
MASPETH: APRIL 2016
SIZE
BOHEMIA: 72,500
MASPETH: 40,000 SF
PROFILE GROUND-UP, PEMB ADDITION & CANOPY AT EACH LOCATION, INVOLVING PILES, GRADE BEAMS, FREEZER SLABS
BJ’S WHOLESALE
7 LOCATIONS
CAPACITY GENERAL CONTRACTOR
COMPLETION 2009-2013
SIZE 750,000+ SF TOTAL
PROFILE VARIOUS GROUND-UP BUILDINGS, ADDITIONS, ALTERATIONS AND SITE WORK AT MULTIPLES LOCATIONS
SIMS METAL MANAGEMENT
BROOKLYN, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION MARCH 2014
SIZE 170,000 SF
PROFILE GROUND UP RECYCLING FACILITY AND OFFICE SPACE. THIS SIMS FACILITY HANDLES THE RECYCLING FOR THE 5 BOROUGHS OF THE CITY OF NEW YORK HAVING TRI-MODAL ONSITE LOGISTIC CAPABILITIES - RAIL-TRUCK-BARGES.
ALUMINUM STAINLESS
LAFAYETTE, LA
CAPACITY CONSTRUCTION MANAGER
COMPLETION NOVEMBER 2015
SIZE 90,000 SF
PROFILE GROUND UP 85,000 SF DISTRIBUTION AND SPECIALTY FABRICATION SHOP, 5,000 SF OFFICE SPACE. PEMB, METAL PANEL AND EXTERIOR CUSTOM METAL CONSTRUCTION WITH INTERIOR TOP RUNNING CRANES.
YARDE METALS
NY, PA, CT, NC
CAPACITY CONSTRUCTION MANAGER
COMPLETION OCTOBER 2012
SIZE NY: 50,000 | PA: 50,000 SF | CT: 140,000 SF | NC: 60,000 SF RENO & ADDITION
PROFILE VARIETY OF GROUND UP AND RENOVATION PROJECTS FOR OUR LONG TERM CLIENT YARDE METALS, A DIVISION OF RELIANCE STEEL. PEMB, MASONRY, METAL WALL PANEL AND EIFS CONSTRUCTION FOR FABRICATION, WAREHOUSING, AND STEEL COIL LINES INCLUSIVE OF OFFICE SPACE AND VARIOUS INTERIOR BUILDING CRANES.
GLOBAL TISSUE
MEDFORD, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION NOVEMBER 2009
SIZE 166,600 SF
PROFILE GROUND UP 151,000 SF OF WAREHOUSE/INDUSTRIAL SPACE WITH MEZZANINE AND 15,600 SF TWO STORY EXECUTIVE OFFICE SPACE. PEMB, INSULATED WALL PANEL AND CURTAIN WALL CONSTRUCTION.
PALLETS-R-US
BELLPORT, NY
CAPACITY CONSTRUCTION MANAGER
COMPLETION NOVEMBER 2009
SIZE 113,000 SF
PROFILE GROUND UP 87,000 SF MANUFACTURING, 22,000 SF GARAGE/REPAIR SPACE, AND 4,000 OFFICE SPACE. PEMB, MASONRY, AND METAL WALL PANEL CONSTRUCTION. 37 LOADING DOCKS AND EXTERIOR GRINDING AREA.
GRUMMAN STUDIOS AT PORT WASHINGTON
PORT WASHINGTON, NY
CAPACITY CONSTRUCTION MANAGER
COMPLETION DECEMBER 2023
SIZE 101,000 SF
PROFILE DEMOLITION OF EXISTING BLDG & SITE. GROUND UP ONE STORY FILM STUDIO BUILDING WITH SITE IMPROVEMENTS, ADDITIONAL LANDSCAPING, AND UTILITY UPGRADES. (6) FILM STUDIOS & (2) ADMINISTRATION WINGS. PRE-FABRICATED CONCRETE TILT-UP PANELS & METAL BAR JOISTS.
ST. GERARD MAJELLA - ROMAN CATHOLIC CHURCH
PORT JEFFERSON, NY
CAPACITY CONSTRUCTION MANAGER
COMPLETION JULY 2020
SIZE 5,500 SF
PROFILE GROUND UP PARISH CENTER ADDITION WITH A BRICK & EIFS EXTERIOR, AS WELL AS MODIFICATIONS TO THE EXISTING CHURCH BUILDING
DORMITION OF VIRGIN MARY - GREEK ORTHODOX CHURCH
SOUTHAMPTON, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION APRIL 2014
SIZE 35,000 SF
PROFILE A 3-PHASE GROUND UP COMPLEX CONSISTING OF A CULTURAL CENTER, SANCTUARY AND COMMUNITY HALL. ALL BUILT WITH CONVENTIONAL STEEL FRAMING. THE CHURCH FEATURES A MARBLE & LIMESTONE FACADE WITH A SLATE ROOF AND COPPER DOME.
DIOCESE OF METUCHEN - MARY SORROWFUL MOTHER MAUSOLEUM
JAMESBURG, NJ
CAPACITY GENERAL CONTRACTOR
COMPLETION DECEMBER 2011
SIZE 16,500 SF
PROFILE GROUND UP MAUSOLEUM BUILT WITH STEEL AND CONCRETE CONSTRUCTION, FEATURING A GRANITE EXTERIOR & ROOF
HOLY ROOD MAUSOLEUM
GARDEN CITY, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION JANUARY 2011
SIZE 20,000 SF
PROFILE GROUND UP, 2-STORY MAUSOLEUM WITH STEEL PILES, GRANITE PANEL WALL & ROOF SYSTEM AND A PRECAST CONCRETE CRYPT SYSTEM
OUR LADY OF ASSUMPTION
COPIAGUE, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION DECEMBER 2022
SIZE 24,000 SF
PROFILE GROUND UP, 2-STORY CHURCH WITH STRUCTURAL STEEL & BRICK SHELL, CUSTOM WINDOWS & DOORS, MARBLE RAISED ALTER, CUSTOM LITURGICAL DESIGN, PRECAST STONE ARCHWAYS, LIGHTING & SOUND CONTROLS
NOTRE DAME PARISH CENTER
NEW HYDE PARK, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION SEPTEMBER 2023
SIZE 15,000 SF
PROFILE FULL GUT RENOVATION OF ORIGINAL 3 STORY CONVENT, STRUCTURAL REMEDIATION, CENTRAL STAIR, ELEVATOR, WINDOWS & DOORS, MECHANICAL, ELECTRICAL, PLUMBING, FIRE ALARM, FIRE SPRINKLER, CHAPEL, SANCTUARY, OFFICES, FOOD PANTRY, MEETING ROOMS.
POLY PREP COUNTRY DAY SCHOOL
BROOKLYN, NY
CAPACITY DESIGN BUILD | GENERAL CONTRACTOR
COMPLETION JULY 2017
SIZE 27,000 SF + POOLS & INTERIOR RENO
PROFILE COMPLETION OF 27,000 GROUND UP ATHLETIC CENTER, (2) NEW EXTERIOR POOLS, AND VARIOUS INTERIOR RENOVATIONS INCLUDING EXISTING GYM FLOOR STRUCTURAL REHAB, ADMINISTRATION SPACE RENOVATION, SCIENCE LAB RENOVATIONS, LOCKER ROOM AND GYM RENOVATIONS.
HORACE MANN SCHOOL
BRONX, NY
CAPACITY SUBCONTRACTOR
COMPLETION NOVEMBER 2019
SIZE 17,000 SF
PROFILE GROUND UP, PEMB NATATORIUM BUILDING TO INCLUDE A 7-LANE SWIMMING POOL
FRIENDS ACADEMY
LOCUST VALLEY, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION JANUARY 2017
SIZE RENOVATION: 25,000 SF | ADDITION: 2,000 SF
PROFILE RENOVATION: FULL GUT RENOVATION WITH ALL NEW INTERIOR FRAMING AND MEPS FOR A MIDDLE SCHOOL BUILDING | ADDITION: GROUND-UP EXTENSION TO INCLUDE CLASSROOMS & A SCIENCE LAB
WANTAGH LIBRARY
WANTAGH, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION OCTOBER 2012
SIZE 17,000 SF
PROFILE FAST-PACED, INTERIOR RENOVATION TO AN EXISTING PUBLIC LIBRARY COMPLETED IN 30 DAYS DURING HOURS OF OPERATION
TUTOR TIME
COMMACK, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION APRIL 2024
SIZE 11,500 SF
PROFILE RENOVATION OF EXISTING PEP BOYS SPACE INTO NEW TUTOR TIME & RETAIL SPACE. INTERIOR DEMOLITION, PARTIAL EXTERIOR DEMOLITION OF EXTERIOR WALLS AT CORNER OF BUILDING FOR NEW OUTDOOR PLAY AREA.
SOUTHAMPTON BREAST CARE CENTER
SOUTHAMPTON, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION DECEMBER 2013
SIZE 3,500 SF
PROFILE INTERIOR RENOVATION FOR NEW BREAST CARE CENTER IN AN ACTIVE HOSPITAL ENVIRONMENT.
VARIAN MEDICAL SYSTEMS
7+ LOCATIONS - NY, CA, WV, IN, TX, MT, OH
CAPACITY DESIGN BUILD GENERAL CONTRACTOR
COMPLETION 2013-2016
SIZE VARIES AT EACH LOCATION
PROFILE GROUND UP AND THERAPY VAULT RENOVATIONS FOR VARIAN TRUEBEAM ACCELERATOR. RETAINED DESIGN TEAM AND DICTATED DESIGN REQUIREMENTS, OBTAINED DEPARTMENT & FACILITY APPROVALS, & COMPLETION OF CONSTRUCTION IN ACTIVE HOSPITAL ENVIRONMENTS.
STONY BROOK HEALTH SCIENCES CENTER
STONY BROOK, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION SEPTEMBER 2015
SIZE 1,000,000 SF
PROFILE MAJOR RENOVATIONS IN AN ACTIVE HOSPITAL ENVIRONMENT
MID ISLAND AIR - NEW YORK JET
RONKONKOMA, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION SEPTEMBER 2020
SIZE 34,500 SF
PROFILE GROUND UP, PEB CONSTRUCTION FOR A PRIVATE AIRCRAFT HANGER WITH EXECUTIVE SUITES & CONFERENCE ROOMS. WEST RAC STRICTLY ADHERED TO THE MACARTHUR AIRPORT & DEPARTMENT OF HOMELAND SECURITY REQUIREMENTS THROUGHOUT THE DURATION OF THE PROJECT
PODS DISTRIBUTION CENTER
13+ LOCATIONS - NY (4), CO (2), FL (2), NH, WA, ME, SC, NM
CAPACITY GENERAL CONTRACTOR
COMPLETION AUGUST 2017-PRESENT
SIZE OVER 1,000,000 SF TOTAL
PROFILE GROUND UP, PEMB CONSTRUCTION WAREHOUSE STORAGE FACILITIES & OFFICES FOR REPEAT CLIENT THROUGHOUT THE US.
LIFETIME CHIMNEY SUPPLY
PLAINVIEW, NY
CAPACITY GENERAL CONTRACTOR
COMPLETION DECEMBER 2019
SIZE 20,000 SF
PROFILE GROUND UP PEMB CONSTRUCTION INCLUDING MANUFACTURING & WAREHOUSE SPACE
JESCO
NY, MD, NJ
CAPACITY DESIGN BUILD | GENERAL CONTRACTOR
COMPLETION 2016 - 2019
SIZE
DEER PARK, NY: 19,900 SF
WALDORF, MD: 16,900 SF
MOUNT HOLLY, NJ: 14,900 SF
PROFILE
DEER PARK, NY & WALDORF, MD: GROUND UP, MULTI-STORY PEMB CONSTRUCTION FOR HEAVY EQUIPMENT SALES WITH A REPAIR CENTER & OFFICE SPACES AT EACH LOCATION
MOUNT HOLLY, NJ: INTERIOR RENOVATION FOR HEAVY EQUIPMENT SALES WITH A REPAIR CENTER & OFFICE SPACES
ARMY CORP OF ENGINEERS
FORT TOTTEN, NY
CAPACITY DESIGN BUILD | SUBCONTRACTOR
COMPLETION APRIL 2017
SIZE 20,000 SF
PROFILE GROUND-UP PEMB CONSTRUCTION WITH METAL PANELS & A STANDING SEAM ROOF AND A FULL ROOF REPLACEMENT ON AN EXISTING BUILDING
VARIAN MEDICAL SYSTEMS
7 LOCATIONS - AZ, TX & NY
CAPACITY DESIGN BUILD | GENERAL CONTRACTOR
COMPLETION 2013-2016
SIZE 7,500 SF EACH
PROFILE GROUND-UP PEMB CONSTRUCTION, LPOE SCAN BUILDINGS FOR HOMELAND SECURITY, USGSA, US BORDER & CUSTOMS CONTROL.